Short answer

A real rooftop unit PM visit works through seven areas: electrical, airflow, the refrigerant circuit, gas heat, the economizer, controls, and condensate. Each area has specific tasks and a reading that gets written down against the unit ID. A visit that only swaps filters and wipes a coil skips most of that, and the skipped items are the ones that cause emergency calls.

Key points
  • A PM visit is judged by the readings it records, not by the time spent on the roof. No readings means no evidence the work was done.
  • Seven areas need attention on every rooftop unit: electrical, airflow, refrigerant circuit, gas heat, economizer, controls, and condensate.
  • Electrical and refrigerant readings only mean something when compared with the unit's own earlier readings, which is why they are logged per unit.
  • The economizer and the condensate drain are the two items rushed visits skip most often, and both fail without any tenant complaint.
  • Ask for the checklist itself, attached to your agreement, not just a promise of a seasonal tune-up.

How a full visit is sequenced

Order matters on a rooftop. Power is isolated and tested before anyone touches a panel, the unit is observed running before it is opened up, and cleaning comes after the as-found readings, not before. If the coil is washed first, the pressures that showed it was fouled are gone and nobody knows the unit was struggling.

  1. Scan the unit tag and review the last visit's notes and readings.
  2. Observe the unit running as found: noise, vibration, cycling, and supply air feel at the registers if accessible.
  3. Record as-found pressures, temperatures, and amp draws.
  4. Lock out power, then do the electrical, airflow, and cleaning tasks.
  5. Restore power, run the heating and cooling sequences, and record as-left readings.
  6. Photograph what changed, write up findings, and sort them into done today, needs approval, and monitor.

This is the same logic described in the broader preventive maintenance program guide, applied to a single rooftop. The tag scan in the first step is the DaVinci Portal at work: the technician sees the unit's history before opening the first panel.

Electrical and airflow tasks

These two areas explain most no-cool and weak-cooling calls. Electrical wear is gradual and measurable. Airflow loss is gradual and usually invisible until the coil ices or the compressor trips.

Electrical

TaskWhat the technician is looking forWhat gets logged
Capacitor testMicrofarad value against the rating on the can; swelling or oil residueRated and measured values for each capacitor
Contactor inspectionPitted or burned contacts, chatter, a coil that runs hotCondition note and photo if replaced
TerminationsDiscolored or loose lugs, heat-damaged insulation, rodent chewingAny lug re-torqued and any wire repaired
VoltageSupply voltage under load and phase balance on three-phase unitsLine-to-line voltage readings
Motor amp drawCompressor, condenser fans, and blower compared with nameplateMeasured amps per motor
Disconnect and fusesCorrosion, loose blades, correct fuse or breaker size on the data plateConfirmation or discrepancy

Work on the building's electrical service, feeders, and panels belongs to a licensed electrician. A mechanical technician reads and records at the unit disconnect and reports what looks wrong upstream. If a visit finds a supply problem, the report should say who needs to address it.

Airflow

TaskWhat the technician is looking forWhat gets logged
FiltersCorrect size and rating, sealed in the rack, no bypass gapsFilter size and condition, date changed
BlowerBelt wear and tension, sheave alignment, bearing noise, wheel buildupBelt size, amp draw, any alignment correction
Evaporator coilDirt film, bent fins, slime on the pan sideBefore and after photos
Condenser coilDebris, grease, cottonwood or leaf matting, salt scale near the coastBefore and after photos, method used
Condenser fansBlade condition, motor bearings, rotation direction, guard secureAmp draw per fan
Duct connectionsDisconnected or torn flex at the curb, loose access panels, missing gasketsFindings and photos

The refrigerant circuit and gas heat

The refrigerant side is where a gauge set earns its keep, and also where a rushed visit does the most damage by guessing. Adding refrigerant because pressures look a little low, without checking airflow and the coil first, is how a unit ends up overcharged and a leak goes unfound for another year.

  • Suction and discharge pressure: read with the unit stable, interpreted against outdoor temperature and indoor return conditions, not against a fixed number.
  • Superheat and subcooling: the two figures that tell a technician whether the charge and the metering device are behaving. Both are calculated and written down.
  • Temperature split across the evaporator: a quick cross-check that airflow and capacity are in the expected range.
  • Leak indicators: oil staining at fittings, service valves, and coil return bends, with a leak search when the charge is off. Refrigerant handling follows EPA Section 608 practice, and any added refrigerant is recorded with the amount. See the refrigerant compliance guide.
  • Compressor behavior: crankcase heater function where fitted, start sound, and amp draw against the earlier visit.
  • Sight glass or sensor status: where the unit has one, note moisture indicators or fault codes.

Gas heat

Gas heating sections get their own tasks, and they are safety tasks first. The technician should confirm a clean, steady ignition sequence, burner flame appearance, and manifold gas pressure, and should look at the heat exchanger for cracks, rust-through, and flame rollout marks. Flue and inducer condition matter because a restricted vent changes how the burners behave. A combustion analysis is appropriate when anything looks off, and the result goes in the record. A unit that is only run on cooling in the warm months still needs its heating section checked before the cold season, which is why the fall visit exists. The seasonal calendar explains where each task lands in the year.

Economizer, controls, and condensate

These three are grouped because they share a trait: they fail quietly and are skipped most often.

AreaTasks on the visitFailure if skipped
EconomizerCommand the actuator fully open and closed, watch the damper travel, check linkage and blade seals, confirm the outdoor air and changeover sensors read sensibly, check fault codes where the unit has diagnosticsDamper stuck closed wastes cooling capacity; stuck open brings in hot or humid air and loads the space
ControlsVerify thermostat or building automation signals reach the unit, confirm schedule and setpoints match what the occupants think they are, test high and low pressure cutouts, freeze protection, and limit switchesUnits running on a wrong schedule, or safeties that have been jumpered out and nobody knows
CondensateClear the drain line and trap, check pan slope and standing water, test the overflow switch where installed, look for algae growthOverflow into the ceiling below; a tenant finds out before you do

Economizer details change by unit and by year of manufacture, and compliance expectations are tied to Title 24. When a replacement or alteration triggers acceptance testing, confirm current requirements with the permit authority. For a plain-language explanation of how economizers fit into the bigger picture, the rooftop unit guide covers them in more depth, and the building controls service covers schedules, sensors, and verification.

The readings that belong in the record

A short, consistent set of readings beats a long inconsistent one. The set below is enough to compare one visit against the next and to see drift before it becomes a failure.

ReadingWhy it is loggedWhat a trend can reveal
Compressor ampsBaseline electrical loadRising amps point to mechanical wear, low voltage, or high head pressure
Condenser fan ampsMotor healthClimbing draw ahead of a bearing or winding failure
Blower amps and belt conditionAirflow healthDropping amps can mean a slipping belt or dirty wheel; rising amps can mean a restricted duct
Suction and discharge pressureCircuit performanceHead pressure creeping up over seasons means the condenser side is losing ground
Superheat and subcoolingCharge and meteringShifts between visits suggest a slow leak or a failing metering device
Supply and return temperatureDelivered capacityA narrowing split at similar outdoor conditions
Outdoor temperature at time of readingContextMakes readings comparable across visits

Because the portal ties every reading to a QR-coded unit record, you can pull up a single rooftop unit's history instead of hunting through PDFs. That is what makes a repair-or-replace conversation grounded in data rather than opinion.

What a rushed visit skips

Rushed visits are not always dishonest. They are usually the result of a contract written around a visit count instead of a task list, with a route that leaves little time on each roof. The pattern looks like this:

  • Filters changed and the report says serviced, with no readings at all.
  • Coils sprayed without as-found photos, so the condition before cleaning is unknown.
  • Pressures taken, but no superheat or subcooling calculated.
  • Capacitors replaced by habit instead of tested, or never tested.
  • Economizer assumed to work because no one complained.
  • Condensate line looked at but not flushed, trap not checked.
  • Heat exchanger not inspected because it is a cooling-season visit.
  • Findings verbal only, so nothing is on paper for budgeting.
Sample scope language

Contractor shall perform each scheduled visit in accordance with the attached rooftop unit checklist, covering electrical, airflow, refrigerant circuit, gas heat where applicable, economizer, controls, and condensate. Contractor shall record as-found and as-left readings for each unit and provide them to Owner with photographs and written findings after each visit. Items outside the checklist are quoted separately before work proceeds.

What to check in the report you receive

After a visit, the report should let a person who was not on the roof tell what happened. Look for a unit identifier, a date and technician, readings with units of measure, photos of coils and drains, and findings divided into done, needs approval, and monitor. If a report is a single line per unit, the contract probably needs a better checklist. The same expectations appear in our page on maintenance reporting and documentation, and the fuller context for scope is in the commercial HVAC maintenance contract scope of work.

Davinci's mechanical and controls work on these visits is performed by its own UA Local 250 crew, with no subcontractors. Electrical service upstream of the unit, roofing, and structural items are outside a mechanical PM, so the scope should name who handles them.

Frequently asked questions

How long should a rooftop unit PM visit take?
It depends on the unit size, access, and condition, so a fixed time is not a good measure. Judge the visit by what was completed: readings recorded, coils cleaned and photographed, drain flushed, economizer exercised. A visit shorter than the task list requires is usually missing tasks.
Which readings matter most on a rooftop unit?
Compressor and fan amp draw, suction and discharge pressure, superheat and subcooling, and supply and return temperature. Taken together and compared with earlier visits, they show electrical wear, airflow loss, and charge problems before a failure happens.
Is a filter change the same as a PM visit?
No. A filter change is one airflow task among many. A PM visit also covers the electrical components, the refrigerant circuit, the economizer, controls, condensate, and gas heat where present. Filters alone will not catch a weak capacitor or a stuck damper.
Do units with gas heat need extra checks in summer?
Yes, ideally before the heating season starts. Burner, ignition, gas pressure, and heat exchanger checks are safety items, and discovering a cracked exchanger on the first cold morning is the wrong time. Many sites handle this in the fall visit.
Can I see the checklist before signing a maintenance agreement?
You should. A checklist attached to the agreement shows what each visit is expected to cover and gives you something to measure reports against. Ask for it per equipment type, not as a general description.

Performed by our own crew. No subcontractors.

The mechanical, refrigeration and controls work on our projects is done by our own UA Local 250 workforce. The people who price the job are the people who set the equipment, pipe it, charge it and start it up, so one team answers for every task in the scope. Rented equipment such as a crane truck is coordinated by us.

How self-performed work works

Want a maintenance scope written for your site?

Send us the equipment list or a walkthrough request and we will return a written scope by equipment type, with visit frequency and documentation spelled out. Davinci Mechanical is the commercial and union division of Scottish Tom's Heating & Air.