Replacing big, costly office rooftop units with multi-zone mini-splits and VRF.

Many Southern California office buildings still run on a few large rooftop units or an aging central system. When one fails, the repair is large, the downtime is wide, and every tenant shares the same comfort problem. Converting to multi-zone ductless or VRF replaces that single point of failure with many small ones and gives each zone its own control.

Conversion is not always the right answer. These guides cover when it is, when a like-for-like replacement is better, what the electrical and structural questions are, how an occupied floor gets phased, and what the maintenance picture looks like afterward.

The work is performed by our own refrigeration and controls crew from design coordination through startup, with no subcontracted trades, so there is one team accountable for piping, charging, controls and commissioning.

Performed by our own crew. No subcontractors.

The mechanical, refrigeration and controls work on our projects is done by our own UA Local 250 workforce. The people who price the job are the people who set the equipment, pipe it, charge it and start it up, so one team answers for every task in the scope. Rented equipment such as a crane truck is coordinated by us.

How self-performed work works

Common questions

Why convert an office from rooftop units to multi-zone mini-splits or VRF?
Zoning, redundancy and control. A failed rooftop unit takes out a whole area, while a failed indoor head or one outdoor module affects far less. Individual zone control also lets tenants set their own comfort and lets the owner see usage by space.
Is conversion always cheaper to operate?
Not automatically. Savings depend on the existing equipment, the building envelope, the occupancy pattern and the controls strategy. We describe the factors to evaluate in the decision guides and recommend a site assessment before anyone commits.
Can an occupied office stay open during conversion?
Usually yes, with phasing by floor or suite, after-hours work for noisy or disruptive tasks, and temporary measures where needed. The phasing guide covers how that is planned.
Do you do the whole conversion with your own crew?
Yes. Piping, refrigerant work, equipment setting, controls and startup are performed by our own UA Local 250 workforce. Rented rigging equipment is coordinated by us. See self-performed work.

Thinking about converting a building?

Send us the building address and the current equipment list. We will walk the roof and the mechanical spaces and tell you whether conversion or in-kind replacement fits.

Request a conversion assessment