Maintenance Plans

Keep your equipment running and your doors open

Three tiers for commercial HVAC, refrigeration, walk-in/reach-in coolers, and commercial water heaters. Every plan waives the diagnostic fee on repairs, includes labor, and comes with DaVinci Portal for QR-coded asset tracking and scheduling.

Condenser coil cleaning
Technician diagnostics
Walk-in cooler service
Ice machine service
Commercial water heater service
Most Coverage

Quarterly PM Plan

4× per year • 4 hours of labor included / year

For kitchens, markets, and high-load sites. Best for uptime, cleanliness, and energy control.

  • Free diagnostic fee on repair calls (service call waived)
  • Preventive maintenance visit(s): inspection, cleaning, tune-up to maximize uptime
  • Measured readings documented (amps, temps, pressures as applicable)
  • Parts billed separately; labor overages at member rate
  • Photo-logged reports and clear recommendations
  • Priority scheduling during peak seasons
  • DaVinci Portal access: QR-coded assets, service history, notes, photos, upcoming work, and self-scheduling
Balanced

Bi-Annual PM Plan

2× per year • 2 hours of labor included / year

Great fit for retail, offices, and schools with moderate usage. Solid protection without over-servicing.

  • Free diagnostic fee on repair calls (service call waived)
  • Preventive maintenance visit(s): inspection, cleaning, tune-up to maximize uptime
  • Measured readings documented (amps, temps, pressures as applicable)
  • Parts billed separately; labor overages at member rate
  • Photo-logged reports and clear recommendations
  • Priority scheduling during peak seasons
  • DaVinci Portal access: QR-coded assets, service history, notes, photos, upcoming work, and self-scheduling
Essentials

Annual PM Plan

1× per year • 1 hour of labor included / year

For lighter-duty sites that still want documentation and a yearly deep service to prevent surprises.

  • Free diagnostic fee on repair calls (service call waived)
  • Preventive maintenance visit(s): inspection, cleaning, tune-up to maximize uptime
  • Measured readings documented (amps, temps, pressures as applicable)
  • Parts billed separately; labor overages at member rate
  • Photo-logged reports and clear recommendations
  • Priority scheduling during peak seasons
  • DaVinci Portal access: QR-coded assets, service history, notes, photos, upcoming work, and self-scheduling

What we service

  • Commercial HVAC: RTUs and split systems
  • Refrigeration: Walk-in & reach-in coolers/freezers
  • Ice machines: Production, sanitization, filtration
  • Commercial water heaters: Tank & tankless
  • Documentation: Photos, readings, clear notes
  • Emergency calls: As available (after-hours rates apply)
Coil cleaning and airflow verification
Temperature & pressure readings recorded
Drain service and leak checks
Combustion/ignition or element checks on water heaters
Included with every plan

DaVinci Portal — QR-coded asset tracking

Every piece of equipment gets a unique QR code. Scan it to see completed services, technician notes, photos, upcoming scheduled work, and to book the next visit—all in one place.

  • QR labels for each RTU, split, cooler, ice machine, and water heater
  • Service history, readings, and technician notes
  • Photo evidence of work completed and site conditions
  • Upcoming PM schedule with self-service booking
DaVinci Portal QR-tagged equipment

How scheduling works

  • We start with a simple walkthrough (or phone intake) to get your equipment count and priorities.
  • We recommend the right tier (Quarterly / Bi-annual / Annual) for your load and environment.
  • You’ll receive a site-specific quote that outlines included labor, member rate, and PM scope.
  • Once approved, we set the first visit and add you to priority scheduling.

Plan FAQs

Do all plans waive the diagnostic fee on repairs?

Yes. Members never pay a separate diagnostic fee on repair calls. Parts are billed separately. Labor beyond the included hours is billed at the member rate.

How do you handle sites with many pieces of equipment?

We inventory the equipment during onboarding and tailor the PM scope and visit length. The tier determines frequency and included labor; pricing is based on your actual equipment count.

Can I change tiers later?

Yes. We can adjust frequency if your load or operations change (for example, moving from bi-annual to quarterly for a busy kitchen).

Is DaVinci Portal really included?

Yes. Every plan includes QR labels and full access to the Portal for service history, photos, notes, and scheduling.

How to choose quarterly, bi-annual or annual

The tier cards above describe what each plan includes. This section is about picking the right one, and the honest answer is that frequency should follow three things: the equipment on the roof and in the back of house, how many hours a day that equipment actually runs, and what a failure would cost the operation in lost product, closed doors or a failed inspection. Price and visit count are the wrong place to start. A single RTU over an office that runs eight hours a day and a single RTU over a dish pit that runs eighteen hours a day are not the same asset, even if they share a model number.

Starting-point recommendations by equipment, load and risk. Site walkthroughs refine these.
SituationTypical starting tierWhy
Full-service restaurant or commercial kitchen with walk-ins, reach-ins and an ice machineQuarterlyGrease-laden air fouls RTU and condenser coils quickly; refrigeration runs 24 hours; health inspections depend on holding temperatures and sanitation records.
Grocery, c-store or market with display cases and walk-in boxesQuarterlyProduct loss is the dominant risk. Case and box temperatures drift gradually before they fail, and quarterly readings catch the drift.
Medical, dental or veterinary suiteQuarterly or bi-annualComfort complaints affect patients and staff; vaccine and medication refrigeration cannot be left to chance. Bi-annual works where refrigeration is monitored separately.
Retail storefront or office suite, standard hours, no refrigerationBi-annualTwo visits timed before summer and before winter cover the seasonal stress points without paying for visits the equipment does not need.
School or public building with RTUs, split systems and a boiler or water heaterBi-annualOccupancy is seasonal and predictable; a pre-summer visit and a pre-heating-season visit align with the academic calendar and procurement cycles.
Warehouse, light industrial or self-storage with few units and low occupancyAnnualOne thorough visit a year catches the handful of issues that would otherwise sit unnoticed and keeps a documented record for the asset.
Chiller, cooling tower or central plant of any sizeQuarterly minimum, often with seasonal add-onsWater treatment, tower cleanliness and refrigerant leak checks on larger charges do not tolerate long gaps between inspections.

Two rules of thumb carry across every row. First, refrigeration pushes a site up one tier compared with the same building without it, because boxes and cases run around the clock and spoil inventory when they fail. Second, any equipment installed within the last two years can usually sit one tier lower than the table suggests while it is still under manufacturer warranty, as long as the warranty's maintenance requirements are met and documented. Mixed sites, such as a retail center with one restaurant tenant among a dozen dry tenants, are commonly split: quarterly on the kitchen and refrigeration assets, bi-annual on everything else, all under one agreement.

What a preventive maintenance visit actually includes

A maintenance visit is not a walk past the equipment with a clipboard. Every asset covered by the plan gets a defined task list that depends on its type, and every task that produces a number produces a recorded reading. The lists below are the core of what happens on each visit. Seasonal tasks, such as heat exchanger inspection before heating season or condenser cleaning before summer, are layered on top depending on the time of year.

Rooftop units and split systems

  • Filters checked and replaced or scheduled; filter racks and access panels inspected for bypass air that lets dirt past the filter and onto the coil.
  • Evaporator and condenser coils inspected and cleaned when the fin surface or the temperature split calls for it, not on a fixed interval that ignores the actual condition.
  • Blower assembly: belt tension and wear, pulley alignment, bearing condition, motor amp draw compared with nameplate and with the previous visit.
  • Electrical: contactor contacts, capacitor microfarad readings against rated value, wire terminations tightened, control board and low-voltage wiring inspected for chafe.
  • Refrigerant circuit: suction and discharge pressures, superheat and subcooling, supply and return air temperatures, and the resulting split, all logged so trends are visible.
  • Condensate drain cleared and tested, pan condition noted, trap and overflow protection verified.
  • Economizer dampers, actuators and sensors cycled and verified where the unit has them, since a stuck economizer quietly costs energy all year.
  • Gas heat section on heat pump and gas-electric units: ignition sequence, flame sense, heat exchanger visual inspection, and limit operation when in heating season.

Walk-in coolers and freezers

  • Box temperature verified with a calibrated thermometer, not just read from the display, and compared against the set point and against the last visit.
  • Door gaskets, sweeps, closers and hinges inspected; a gasket that does not seal is the single most common reason a walk-in runs long and ices up.
  • Evaporator coil and fan motors inspected; defrost cycle, heaters and termination verified; drain line heat trace and drain pan checked on freezers.
  • Condensing unit coil cleaned as needed, fan operation verified, pressures and compressor amps recorded.
  • Refrigerant charge assessed by superheat and subcooling, and any evidence of leaks noted for follow-up under California and federal refrigerant rules.
  • Controls, alarms and any remote monitoring checked for correct set points and alarm delays.

Ice machines

  • Cleaning and sanitizing of the water system and evaporator per the manufacturer's procedure, with the cycle logged so a health inspector can see when it was done.
  • Water filter condition and change date, inlet water pressure, float and water level verification.
  • Harvest and freeze cycle timing recorded, bin thermostat or sensor checked, and production compared with rated capacity at the ambient conditions on site.
  • Condenser cleaned, especially on air-cooled machines sitting in hot kitchen corners where airflow is poor.

Commercial water heaters

  • Combustion and ignition inspected on gas units, elements and contactors tested on electric units, and inlet and outlet temperatures recorded.
  • Venting, draft and combustion air verified; flue connections and condensate neutralizers on condensing units inspected.
  • Tank flush or sediment check where applicable, anode rod inspection on tank units, and descaling schedule reviewed on tankless units in hard-water areas.
  • Temperature and pressure relief valve, expansion tank and recirculation pump operation verified.

Chillers, boilers and hydronic plant

  • Chiller operating log: entering and leaving water temperatures, approach temperatures, refrigerant pressures, oil pressure and level where applicable, compressor amps and run hours.
  • Cooling tower fill, basin, drift eliminators and float inspected; water treatment program results reviewed with whoever manages chemistry.
  • Pumps: seals, couplings, vibration and amp draw; strainers cleaned; isolation and balancing valves exercised.
  • Boilers: combustion analysis, low-water cutoff test, relief valve, flame safeguard, and a visual check of the fireside and waterside where access allows.

Thermostats, schedules and building controls

  • Occupied and unoccupied schedules confirmed against how the space is actually used, including holiday calendars.
  • Sensor readings compared against a reference instrument and recalibrated or flagged.
  • Set points, deadbands and lockouts reviewed so heating and cooling are not fighting each other across adjacent zones.
  • Override logs reviewed for the zones that keep getting overridden, which usually points to an airflow or equipment problem rather than a tenant problem.

Full equipment background sits in the resource library: the rooftop unit guide, the walk-in cooler and freezer guide, the ice machine guide, and the chillers and hydronic systems guide.

How the DaVinci Portal records work

Every asset on a plan gets a QR label at onboarding. The label ties the physical unit to a record in the DaVinci Portal that holds the nameplate data, the location on site, the full service history, every reading logged on every visit, the technician's notes, and the photos taken before and after work. Scanning the label with a phone opens that record. There is no app to install and no login hunt when a manager is standing on a roof trying to remember which of six identical units was the one that was down last spring.

  • Service history: each PM visit, repair and recommendation is listed with the date, the technician and what was done, so a new facility manager inherits the equipment's story rather than starting over.
  • Readings: temperatures, pressures, amps and microfarads are stored as numbers, not buried in a PDF, so the trend described above is visible on the asset record.
  • Photos: coil condition, gasket damage, burnt contactors and nameplates are photographed and attached, which is the evidence auditors, insurers and landlords usually ask for.
  • Upcoming work: open recommendations, deferred repairs and the next scheduled PM visit sit on the record, and the next visit can be booked from it.
  • Portfolio view: a property manager with multiple sites sees every asset across every location in one place, which turns capital planning from guesswork into a sortable list.
Records belong to the site

The Portal record is built around the equipment, not around the contract. Reports can be exported for a health inspection binder, an insurance claim, a lease handoff or a capital request. Facility teams that need documentation for public-sector audits or prevailing-wage work find the same photo-and-reading format useful there too.

Seasonal timing in Southern California

Southern California does not have the hard freeze that organizes maintenance calendars in other parts of the country, but it has its own rhythm, and the visit schedule is built around it rather than around the calendar quarter. The regional pattern is covered in depth in the Orange County commercial HVAC climate guide; the operational version is below.

Pre-summer, roughly April through early June

This is the most important visit of the year for cooling equipment. Condenser coils are cleaned, refrigerant circuits are verified, capacitors and contactors are tested under load, and economizers are checked so they shut properly when outdoor air gets hot. The goal is to have every unit proven before the first heat event, because the first ninety-degree week is when marginal equipment fails and when every contractor's schedule fills with emergency calls. Plan customers get priority during that window, but the better outcome is not needing it.

Late summer and Santa Ana wind season, September through December

Inland Orange County, the Inland Empire and the valleys see their hottest days in September and October, often during Santa Ana wind events that bring hot, dry, dusty air out of the high desert. Those winds load condenser coils with fine dust and debris in days, and they coincide with the time when rooftop filters are most clogged from a long cooling season. A quarterly plan places a visit in this window; bi-annual sites in inland areas often add a coil wash here. Because gas heat sections and boilers have sat idle since spring, this visit also covers the first heating-season checks: ignition, flame sense, heat exchanger inspection and combustion readings.

Coastal corrosion, all year

From Seal Beach down through Huntington Beach, Newport Beach and Laguna, salt air attacks condenser fins, cabinet fasteners, contactor terminals and copper line sets continuously. Coastal rooftop equipment does not fail on a seasonal schedule; it corrodes steadily until a fin pack crumbles or a terminal arcs. Coastal sites on any tier get fin inspection and a freshwater rinse as part of the visit, coated-coil options are recommended at replacement, and electrical terminations are examined more closely than they would be inland.

Winter, January through March

Mild winters make this the right time for work that needs equipment offline: heat exchanger inspection, major coil cleaning on refrigeration, chiller tube cleaning, boiler service and controls recommissioning. It is also the window for planning replacements so that crane days, permits and Title 24 paperwork are complete before the summer rush. See RTU replacement planning for what that lead time involves.

How plans interact with repairs and replacements

A maintenance plan reduces repairs; it does not eliminate them. What changes is how repairs happen. On a plan site, most repair needs are identified on a PM visit as a documented recommendation with photos and readings, which means the facility manager approves work from a desk with evidence in hand rather than from a parking lot during an outage. The diagnostic fee is waived on repair calls for plan members, included labor hours apply first, and labor beyond those hours is billed at the member rate. Parts are always billed separately and quoted before installation.

  • Small corrective items found during a visit, such as a weak capacitor or a failed contactor, are typically completed on the spot when parts are on the truck, using included labor.
  • Larger repairs are written up with options. Where a repair would consume a disproportionate share of the unit's remaining value, the write-up says so and compares repair with replacement using the recorded history.
  • Repairs completed by the plan technician are logged on the same Portal record, so repair history and maintenance history are not in two different filing systems.
  • When a replacement is the right answer, the plan continues on the new equipment, usually at a lower tier during the warranty period, and the old asset record is archived rather than deleted so the history of that location survives.

Plan status also matters for second opinions. If another contractor has recommended a replacement or a major repair, the plan record gives an independent baseline of how the unit has actually performed. Owners without that history can still request a second-opinion diagnostic before committing to a large expense.

Multi-site and portfolio programs

Restaurant groups, property management companies, grocery operators, school districts and medical groups rarely want one agreement per address. Portfolio programs put every site under a single scope document with a per-site equipment schedule, so a twelve-location group with kitchens at eight of them and dry retail at four can run quarterly where it matters and bi-annual where it does not, with one point of contact and one reporting format. Site-level detail for Orange County cities is on the city plan pages, for example Irvine, Anaheim and Santa Ana; the full list is above.

  • Standardized task lists and readings across all sites, so comparing one location's equipment health to another's is meaningful.
  • Portfolio dashboards in the Portal that rank assets by age, repair frequency and open recommendations, which is the raw material for a capital replacement plan.
  • Consolidated reporting on a cadence that matches the client's budget cycle, whether that is monthly for a restaurant group or annually for a school board.
  • Coordination with tenants in multi-tenant retail and office, including access scheduling and clear separation between landlord-owned and tenant-owned equipment.
  • Prevailing-wage and certified payroll handling for public portfolios, with the documentation public agencies expect; see the prevailing wage guide.

Portfolios outside Orange County, in Los Angeles County, the Inland Empire, San Diego County and Ventura County, are taken on when the scope is large enough to justify consistent coverage, generally larger commercial, institutional or public work. Sector-specific context is on the property management, restaurants, grocery and retail and schools pages.

What a plan does not cover

A clear boundary makes an agreement easier to live with. The following are outside a standard maintenance plan and are quoted separately when needed, so there is no surprise when they come up.

  • Replacement parts, compressors, motors and refrigerant. The plan covers labor hours and the diagnostic fee; parts are always a separate line.
  • Equipment replacement, new installations, crane work, curb adapters, permits and Title 24 acceptance testing. These are projects, not maintenance; see RTU and split installs.
  • Kitchen hood and exhaust duct cleaning. Exhaust fans, make-up air units and kitchen airflow balance are serviced under kitchen ventilation, but grease duct cleaning is a separate trade.
  • Water treatment chemicals and chemistry programs for cooling towers and boilers, though the readings are reviewed and coordinated with the treatment vendor.
  • Damage from power events, flooding, roof leaks, vandalism or operation outside design conditions, which is an insurance matter documented with the Portal photos and readings.
  • After-hours emergency response rates. Plan members receive priority, but work performed outside normal hours is billed at the after-hours member rate, which is quoted before dispatch.
  • Residential equipment of any kind. Davinci Mechanical is the commercial-only division; residential work is referred elsewhere.

Switching from a reactive posture, with a first-year timeline

Most new plan customers arrive after years of calling whoever answered the phone when something broke. The equipment at those sites usually has no history, several deferred problems and at least one unit that has been limping. The first year of a program is about establishing a baseline and clearing the backlog in a controlled order, not about perfection on day one. The sequence below is typical for a mid-sized commercial site moving to a quarterly plan; bi-annual and annual sites follow the same shape with fewer visits.

  1. Walkthrough and inventory. Every unit is located, photographed, nameplated and QR-labeled. Obvious safety issues and anything already failing are noted. This visit produces the equipment schedule the agreement is written against, and it also tells you which tier each asset belongs in.
  2. First PM visit, within the first month. Full task list on every asset, with complete readings. Expect a longer-than-normal list of recommendations; the point is to see everything at once rather than piecemeal over a year of breakdowns.
  3. Backlog triage. Recommendations are sorted into three groups: do now because it is a failure or safety risk, do this quarter because it is drifting toward failure, and plan for because the unit is near end of life. The facility manager approves by group rather than item by item.
  4. Second visit, next quarter. Backlog items in the first two groups are completed, readings are taken again, and the first real trend comparison is available. This is usually where a slow refrigerant leak or a failing blower motor shows itself.
  5. Third visit, timed to the season. Pre-summer or Santa Ana season depending on the start date, with the seasonal tasks layered on. By now the site should be running on recommendations rather than emergencies.
  6. Fourth visit and annual review. The year's readings, repairs and open items are reviewed together. Units near end of life get a replacement plan with lead time for permits and crane scheduling, the tier for each asset is confirmed or adjusted, and the next year's calendar is set.
What changes by the end of year one

The site has a complete, photo-documented record of every asset, a realistic list of what will need replacing and when, and a visit calendar aligned to the seasons that actually stress the equipment. Emergency calls do not disappear, but they stop being the way problems are discovered. The deeper version of this process is in the preventive maintenance program guide.

To start, request a walkthrough or call (714) 594-9194. The equipment count and operating hours from that visit determine the tier recommendation and the site-specific scope. For the service list behind each task above, see maintenance plans and the related equipment services, and for the people and credentials behind the work, see about Davinci Mechanical.

More questions, answered

Can different pieces of equipment at the same site be on different tiers?
Yes, and for mixed-use properties it is the normal arrangement. A shopping center with one restaurant tenant and several dry retail tenants typically runs quarterly on the kitchen RTU, walk-ins and ice machine and bi-annual on the other rooftop units, all under one agreement with one equipment schedule. The walkthrough at onboarding assigns each asset to a frequency based on its load and failure risk rather than applying one tier to the whole address.
Does a plan satisfy manufacturer warranty maintenance requirements?
Most commercial equipment warranties require documented periodic maintenance, and the plan is designed to meet that. Each visit's task list and readings are logged against the asset in the DaVinci Portal with the date and technician, which is the record a manufacturer asks for when a warranty claim is filed. Confirm the specific interval your manufacturer requires, since some compressor and heat exchanger warranties specify more frequent service than an annual plan provides.
What happens to the included labor hours if they are not used?
Included labor hours apply to repair work during the plan year and do not carry over. In practice they are used on most sites, because PM visits surface small corrective items such as capacitors, contactors, belts and gaskets that are completed on the spot. Sites with new equipment under warranty sometimes finish a year with hours unused, which is one of the reasons newer equipment is often placed on a lower tier until the warranty period ends.
Do I need to be on site for maintenance visits?
Not for the maintenance itself, as long as roof and equipment room access has been arranged. Visits are scheduled through the Portal or by phone, the technician checks in on arrival, and the completed report with readings and photos posts to the asset records when the visit closes. Many property managers never attend a routine visit and instead review the report and approve any recommendations from the Portal. Refrigeration work in an operating kitchen is coordinated around service hours.
How is a maintenance plan different from a service contract with repairs included?
A full-coverage contract bundles parts and major repairs into a fixed fee and prices in the risk of equipment failing. A maintenance plan covers scheduled visits, the diagnostic fee and a block of labor, with parts billed as they are needed and quoted first. The plan model keeps the incentives honest: there is no reason to defer a repair to protect a margin, and no reason to replace a part that is still within tolerance. Owners who want fixed-fee coverage on specific critical assets can discuss that at the walkthrough.
Can a plan start partway through the year or after a major repair?
Yes. Plans start whenever the walkthrough is complete, and the first visit is scheduled within the first month regardless of season. Starting right after a significant repair or replacement is common and sensible, since the new work is documented from day one and the warranty maintenance record begins immediately. The visit calendar is then set so that the pre-summer and heating-season visits land where they should, even if the first visit falls in between.
Is a plan available for a single piece of equipment?
Yes. A single RTU over a small retail unit or a single walk-in in a catering kitchen can be placed on an annual or bi-annual plan with its own QR label and Portal record. The scope scales with the equipment count, so a one-unit plan is short and focused. Owners with a single critical asset, such as the only walk-in in a restaurant, often choose quarterly for that one unit because the cost of a failure is concentrated in one box.